In support of the book our principal is writing on utility-scale PV:
Database and mapping of utility-scale solar parks |
|
The book will include maps showing the known existing and planned solar parks over 10MW. Because the number is growing so fast, this information is maintained in an online database of projects, containing the information outlined below.
If you are aware of additional installations not shown on the map, or have additional information about projects which are listed, please let us know as shown below. |
|
To view an interactive copy of the map, see here.
These are listed in order of MW capacity.
Maps are also available listed by commissioning date and alphabetically by name. |
|
The maps also shows projects under development[a], decommissioned and some notable projects under 10MW. These are indicated by icons with the array in grey, white and light blue respectively. Operating projects over 10MW are in dark blue.
Most of the locations are spot on, but some may not be, where the satellite images didn't show the solar park when the coordinates were provided. If you can correct any of these, please email us at the address below. |
|
To provide information about solar parks over 10MW: |
|
Please email us at mapping@wolfeware.co.uk with details of any new solar parks over 10MW, or any where the details on our existing maps are not up-to-date (quoting the solar park name currently used on the map). We need: |
|
Solar park name
Names of: Owner; Developer; Constructor / EPC contractor [b]
Location; latitude and longitude; site area (pref. hectares)
Capacity; MWp DC and MVA AC [c]
Output; GWh per annum; tonnes of CO2 saved per annum [c]
Date of connection [c]
Solar modules; type (Cx or thin film) and quantity
Tracker: 1-axis, 2-axis or none; Concentrator?
Photographs: Please supply pictures we can use with copyright details
Website or weblink where information about the project can be confirmed |
|
[a] Except for the map with sites sorted by commissioning date. Projects under development are listed at our discretion if they are under construction or have achieved at least one of: planning consent, financial close, PPA or grid connection.
[b] Where multiple parties involved, list them all (if owners, with percentages).
[c] Please provide separate capacity, output and date information for each section, if the project was constructed in phases. |